Highland Park Neighborhood Association, Inc
3578 Hartsel Dr. E 324
Colorado Springs, CO 80920
ARCHITECTURAL CONTROL COMMITTEE
Read “Documents Links” and the “Checklist” for a complete submission.
An important function of the HPA is to review and approve architectural submissions. Ensuring that construction complies with
the covenants is a major factor in maintaining property values.
Committee Members:
Neal Eby
Tel: 719-358-1000 cell Email: nealeby@highlandpark-colorado.com
David Ellis
Tel: 719- Email: davidellis@highlandpark-colorado.com
Brian Landis
Tel: 719- Email: brianlandis@highlandpark-colorado.com
Hand Delivery of Plans:
Call any ACC Member to coordinate delivery of request. The Architectural Committee has up to 30 days to review complete submissions, but usually makes a decision in less time.
Helpful Documents Links: Architectural Design and Requirements (Para. 9 Covenants)
Landscape Reference Policy
Energy Device Policy
Following is a CHECKLIST for architectural submissions:
Link to: ACC Submittal Form
3. A set of scaled architectural drawings (blueprints) with plan, elevations, and construction details. This is for new home construction, additions, and detached buildings. Submit one paper set of plans and one electronic set.
Include:
# Roofing sample or brochure showing type of shingle and color
# Paint chip-body color
# Paint chip-trim color
# Exterior material samples (brick, stucco, stone, siding, etc.). Note: approximately 25% of the front of the house must have stone, brick or stucco (some masonry material that is different from the rest of the exterior–no all stucco homes).
4. Application fee of $200.00 required for new homes.
Fee schedule for smaller submittals will be published when ready.
ALL documents, including plans, are to be submitted electronically.